Surface
concrete
Material
concrete
Length
26 m
Elevation
10 m
Road
Thomas Vincent Ramos Highway
Waterway
Joe Taylor Creek
Settlement
Punta Gorda Town
Construction
2023-10
Opened
2025-06-13

The Mike Espat Bridge used to be called the Joe Taylor Bridge, and it is now the 4th version of that bridge. The current structure is a 25m triple span bridge with two traffic lanes as well as 2 pedestrian walkways.[1]