Construction of the J&W Bridge and approaches with a view to facilitate all-weather access to Settlement 456 . The J&W area of Settlement 14 was at risk to periodic severe floods, overwhelming the culverts and leaving the residents isolated. The bridge is a 23.5 meters single-span reinforced concrete structure built with pre-fabricated AASHTO Type 3 girders. Works were completed for less than Bz$1M. This sum also included the Treasury (J&W) Road Upgrade to provide more robust infrastructure to that growing community.[1]