[{"data":1,"prerenderedAt":29},["ShallowReactive",2],{"bridge-208":3,"map-data-bridge-208":27},{"id":4,"name":5,"surface":6,"material":6,"historyMd":7,"lat":8,"lng":9,"startDateConstruction":10,"startDateConstructionSource":11,"districtId":12,"roadId":13,"district":14,"road":17},208,"Pueblo Nuevo Low Lying Bridge","concrete","The bridge consists of 9 spans of AASHTO Type III prestressed concrete girders, supported by the longest prestressed concrete piles ever manufactured in Belize.\u003Cref>https://www.facebook.com/share/p/17H2pnW1ij/\u003C/ref>",18.33736,-88.4087,"2026-06","https://www.facebook.com/share/p/17H2pnW1ij/",3,95,{"id":12,"name":15,"ref":16},"Corozal","CZ",{"id":13,"name":18,"districtId":12,"historyMd":19,"osmRelationId":20,"shapeId":21,"lat":22,"lng":23,"ref":24,"isArterial":25,"isFeeder":25,"isDistributor":26},"Corozal - Sarteneja Road","The Corozal-Sarteneja Road was formed in November 2018 when the upgrading of the Corozal-Sarteneja Road Project was initiated by cobbling together the [[road:93]], a section of the [[road:92]], a section of the [[road:94]] and then most of the [[road:95(2017)]].\n\n## Corozal to Sarteneja Road Upgrading Project\nThe Corozal to Sarteneja Road Upgrading Project (42.3 km) was funded via a loan provided\nby Export-Import Bank of the Republic of China (Taiwan). The GOBZ single sourced and signed\na contract with Oversees Engineering & Construction Co. Ltd (OECC) S.A. to carry out a design and build project.\n\nThe Contract was signed on November 2018\u003Cref>https://www.pressoffice.gov.bz/wp-content/uploads/2024/10/Min-of-Infrastructure-Dev-Housing-ATR-2023-2024.pdf\u003C/ref> for upgrading of 27 miles of the\nCorozal Sarteneja Road. This road project also involves construction of the [[bridge:184]] and the  [[bridge:61]] which\nreplaced the old, dilapidated ferries at Pueblo Viejo and Laguna Seca.\n\nThe project was broken into three components:\n- Design of Corozal to Sarteneja Road valued at USD $1,500,000.00\n- Corozal to Sarteneja Road Upgrading valued at USD $43,500,000.00\n- Supervision of Corozal to Sarteneja Road Upgrading Project valued at USD $3,500,000.00\n\nBy 2024 61% of the project had been completed.\u003Cref>https://www.pressoffice.gov.bz/wp-content/uploads/2025/12/Min-of-Infrastructure-Dev-Housing-ATR-2024-2025.pdf\u003C/ref>\n\nThe project was completed in 2025.\u003Cref>https://mof.gov.bz/ova_doc/ministry-of-infrastructure-development-and-housing-infrastructure-report-march-2026/\u003C/ref>\n\n## Pueblo Nuevo Sunken Road Bridge\nSoon after the construction of the Corozal-Sarteneja Road a 200 meter section on the north side of the Pueblo Nuevo Bridge began to deteriorate quicly du to boggy soil underneath, and after a few months it stood under a foot of water constantly. So in May 2026 the Republic of China (Taiwan) loaned $4.4 million to the Government of Belize to construct a 200 meter bridge over the gap.\u003Cref>https://www.facebook.com/share/p/1B5RKTV8yW/\u003C/ref>",19565187,371,18.30199,-88.24873,"480",false,true,{"extraChronologyRelationIds":28},[],1782962691914]