On June 14, 1962, part of a temporary pontoon bridge collapsed on the Waterway 131 in Settlement 12. The temporary crossing, made of two barges, had been put up between Richard Sidewalk and Pickstock Street (Settlement 401) while repairs were being carried out on the Swing Bridge, and like the Swing Bridge of that time it was built to swing open. At about 10:30 a.m. that day an oil barge became stuck at the Swing Bridge, and after waiting 25 to 30 minutes, pedestrians walked down Regent Street West to the temporary bridge, which was not yet finished and had not been intended for foot traffic.
The weight of 45 to 60 women and children standing on the 10-by-12-foot apron of the southside barge broke the eye bolt holding the apron in place, and the apron and the people on it fell into about eight feet of water. The Belize Billboard reported six deaths on June 15, 1962; seven people, five children and two adults, drowned in all. A commission of inquiry held public hearings and concluded that the crowd had overloaded the apron before the Pickstock Street barge was placed under its end.[1]
In 1998 the Swing Bridge was repaired after years of extensive corrosion. The repairs were interrupted by Hurricane Mitcch, but after 8 months the bridge was reopened to the public at 6:00 am on February 26, 1999. The repairs were done by Abe Banman and costed $865,000.[2]