In 1960 the bridge decking was replaced.[1]

The Hawkesworth Bridge Maintenance Project of 2024 focused on providing a round of periodic maintenance to the historic structure. Compromised members were replaced, loose fasteners tightened and braces strengthened. Concrete foundation elements also received periodic repairs at this time. The entire structure was also power washed, sand blasted and repainted.[2]