[{"data":1,"prerenderedAt":40},["ShallowReactive",2],{"bridge-40":3,"map-data-bridge-40":38},{"id":4,"name":5,"surface":6,"material":7,"lengthM":8,"lat":9,"lng":10,"startDateConstruction":11,"startDateConstructionSource":12,"startDateOpening":13,"startDateOpeningSource":12,"waterwayId":14,"districtId":15,"roadId":16,"waterway":17,"district":24,"road":27},40,"Rio Blanco Bridge","paved","concrete",32.1,16.23051,-89.10043,"2011-04","https://www.cisco.com.bz/placencia-road-upgrading-2/","2014-03",34,6,10,{"id":14,"name":18,"lengthM":19,"startEle":20,"endEle":21,"destinationWaterwayId":22,"wikidata":23},"Blue Creek",40450,684,21,190,"Q21870419",{"id":15,"name":25,"ref":26},"Toledo","TO",{"id":16,"name":28,"lengthM":29,"startDate":30,"districtId":15,"historyMd":31,"ohmChronologyId":32,"osmRelationId":33,"shapeId":34,"ref":35,"isArterial":36,"isFeeder":36,"isDistributor":37},"San Antonio Road",34620,"1938","# History\nA road existed from the [[settlement:415(1885)]] to [[settlement:202(1885)]] in 1885.\u003Cref>https://ia600206.us.archive.org/10/items/colonybritishho00morr/colonybritishho00morr.pdf\u003C/ref>\n\nThe **Punta Gorda-San Antonio Road** was surveyed in 1930\u003Cref>https://ia601701.us.archive.org/25/items/colonial-reports-1930-1534/ColonialReports1930-1534.pdf\u003C/ref> and construction started in 1938. By the end of the year 17 miles had been constructed.\u003Cref>https://ia801507.us.archive.org/6/items/colonial-reports-1938-1894/ColonialReports1938-1894.pdf\u003C/ref> The road used to go from [[settlement:202(1980)]] to [[settlement:224(1980)]] before the eastern section was merged into the [[road:5(1980)]], probably sometime in the 1980s. The western section of the road became the [[road:10(1980)]].\n\nIn 2012 the San Antonio Road was upgraded to a two lane bituminous highway.",2894642,21023158,510,"723",false,true,{"extraChronologyRelationIds":39},[],1783363406238]