History
Construction of the Crooked Tree Road started in 1964/65.[1]
In 1983 the causeway was constructed across the entire lagoon without any culverts or bridges. This project was carried out by the Ministry of Works and funded by World Bank and USAID. This causeway created a permanent lake on the north side, so in 1992 two bridges were constructed to allow the water to flow again.[2]
In 2023 the road got paved with chip seal.[3]
References
[1] Colonial Report of British Honduras 1964-65