The Grand Belize Bridge (1818-1859)


The first known bridge to be built in the colony was completed on March 9th, 1818 as the Grand Belize Bridge.[1]

The Grand Belize Bridge (1859-1922)


The Grand Belize Bridge was reconstructed in 1859 and was demolished on July 28, 1922 for the construction of the new swing bridge.[1]

Temporary Wooden Bridge (1922-1923)


A temporary wooden bridge was constructed during the construction of the Swing Bridge.[1]

The Swing Bridge (1923-2026)


The Swing Bridge was contructed during 1922 and opened to the public on April 11, 1923 at a cost of $84,000.[1]

By Order No. 95 of 25th January, 1940 the bridge swinging hours were changed from 7-8 to 5 o'clock in the morning, taking effect on March 1.[2]

On June 14, 1962, part of a temporary pontoon bridge collapsed on the Waterway 131 in Settlement 12. The temporary crossing, made of two barges, had been put up between Richard Sidewalk and Pickstock Street (Settlement 401) while repairs were being carried out on the Swing Bridge, and like the Swing Bridge of that time it was built to swing open. At about 10:30 a.m. that day an oil barge became stuck at the Swing Bridge, and after waiting 25 to 30 minutes, pedestrians walked down Regent Street West to the temporary bridge, which was not yet finished and had not been intended for foot traffic.

The weight of 45 to 60 women and children standing on the 10-by-12-foot apron of the southside barge broke the eye bolt holding the apron in place, and the apron and the people on it fell into about eight feet of water. The Belize Billboard reported six deaths on June 15, 1962; seven people, five children and two adults, drowned in all. A commission of inquiry held public hearings and concluded that the crowd had overloaded the apron before the Pickstock Street barge was placed under its end.[3]

In 1998 the Swing Bridge was repaired after years of extensive corrosion. The repairs were interrupted by Hurricane Mitcch, but after 8 months the bridge was reopened to the public at 6:00 am on February 26, 1999. The repairs were done by Abe Banman and costed $865,000.[4][1]

Swing Bridge Replacement (2026-)


On January 17, 2025 the reconstruction of the Bridge 24 was announced. The Governments of Japan and Belize signed an Exchange of Notes (E/N) and a Grant Agreement (G/A) for $28,000,000 for the reconstruction project.[5]

In October and November 2026, MIDH Chief Engineer Evondale Moody said demolition of the old Bridge 24 was to begin on December 1, 2026, with replacement construction continuing into 2027.[greaterbelize.com/national-infrastructure-work-continues-despite-rain](https://www.greaterbelize.com/national-infrastructure-work-continues-despite-rain/)[7newsbelize.com/sstory.php](https://www.7newsbelize.com/sstory.php?nid=80490) The removal depended on the Bridge 218 first opening to traffic as the alternative crossing. After that, procurement with Japan for the new Swing Bridge was to begin, with two to three months allowed to take down the old structure.[lovefm.com/temporary-swing-bridge-crossing-80-complete-traffic-delays-expected](https://lovefm.com/temporary-swing-bridge-crossing-80-complete-traffic-delays-expected/) A BTL fibre-optic line under the riverbed at the Swing Bridge was to be moved onto the Hyde's Lane crossing.[lovefm.com/temporary-swing-bridge-crossing-80-complete-traffic-delays-expected](https://lovefm.com/temporary-swing-bridge-crossing-80-complete-traffic-delays-expected/)