San Antonio Road
Toledo
Loading map...
Constructed
1938 (88 years ago)

Table of Contents

History

A road existed from the Settlement 415 to Settlement 202 in 1885.[1]

The Punta Gorda-San Antonio Road was surveyed in 1930[2] and construction started in 1938. By the end of the year 17 miles had been constructed.[3] The road used to go from Punta Gorda Town to Settlement 224 before the eastern section was merged into the Southern Highway, probably sometime in the 1980s. The western section of the road became the San Antonio Road.

In 2012 the San Antonio Road was upgraded to a two lane bituminous highway.


Bridges

#
1Crique Sarco Bridge
TO
Temash River
2015-03
https://www.nationalassembly.gov.bz/wp-content/uploads/2016/09/26th-March-2015.pdf
60
-
metal
-
12
1,428,209,769
2Crique Trosa Bridge
TO
Crique Trosa
1996-01
https://www.cisco.com.bz/construct-deck-type-truss-bridge/
-
-
concrete
unpaved
-
-
3Crique Trosa Bridge
TO
Crique Trosa
2011-04
https://www.cisco.com.bz/placencia-road-upgrading-2/
16.4
-
concrete
paved
-
-
4Jalacte Bridge
TO
-
2011-04
https://www.cisco.com.bz/placencia-road-upgrading-2/
11.1
-
concrete
paved
-
-
5Jalacte Creek Bridge
TO
Jalacte Creek
2011-04
https://www.cisco.com.bz/placencia-road-upgrading-2/
56
-
concrete
paved
-
-
6Mafredi Bridge
TO
Mafredi Creek
2011-04
https://www.cisco.com.bz/placencia-road-upgrading-2/
5.3
-
concrete
paved
-
-
7Pueblo Viejo Bridge
TO
Pueblo Creek
2017-04
-
24.3
-
concrete
paved
291
1,099,391,065
8Rio Blanco Bridge
TO
Blue Creek
2011-04
https://www.cisco.com.bz/placencia-road-upgrading-2/
32.1
-
concrete
paved
-
-
9San Antonio 1 Bridge
TO
Ha-ill Chiac
2011-04
https://www.cisco.com.bz/placencia-road-upgrading-2/
18.3
-
concrete
paved
-
-
10San Antonio 2 Bridge
TO
-
2011-04
https://www.cisco.com.bz/placencia-road-upgrading-2/
20.4
-
concrete
paved
-
-
11San Antonio 3 Bridge
TO
Mafredi Creek
2011-04
https://www.cisco.com.bz/placencia-road-upgrading-2/
18.9
-
concrete
paved
-
-
12Santa Elena Bridge
TO
Manzana Stream
2011-04
https://www.cisco.com.bz/placencia-road-upgrading-2/
19.2
-
concrete
paved
-
-