Johnson Street was a street in the Settlement 406 area of Settlement 12, close to the Bridge 27. Constitution Park stood at its corner with Cemetery Road.[1]
History
In a newscast on March 3, 2026, Ministry of Infrastructure Development and Housing (MIDH) Chief Engineer Evondale Moody said the works to replace the Bridge 85 and the Bridge 24 would put heavy strain on Road 9 and the Bridge 27. He said the ministry would try to do works on "a street that comes off BelChina, I think it's called Johnson Street" to ease traffic in the city.[2]
On September 3, 2026, the MIDH reported that one of its teams was paving Johnson Street, which was expected to carry heavy traffic during the projects to replace the Bridge 85 and the Bridge 24.[3] By October 10, 2026, the MIDH had finished paving Johnson Street, which was to serve as a major link once work got underway on replacing the two bridges. The ministry was also building driveways and walkways along the street for its residents.[4]