History

By 1949 a village had grown around the saw mills at Mango Creek.[1]

In 1963 tenders were given out for the construction of an Administrative Building in Independence. [2]

Two water wells were drilled by the Public Works Department in 1964/65.[3]

Etymology

Independence and Mango Creek were counted as one in the 1980 census and spelled as Independence & Mango Creek. [4]

Political

In 2002 Settlement 195 and Settlement 124 were moved from the Toledo East Constituency to the Stann Creek West Constituency.[5]

Infrastructure

Electricity

In 1963 the resin factory at Mango Creek had its own 150 kW power plant, with two 75 kW units.[6]

By 1993 Independence had a diesel power plant with four units totalling 1.3 MW.[7] On July 16, 2003 the Independence Substation was completed, and the line from Settlement 79 to Independence was energised at 34.5 kV, connecting Independence to the national grid. The Independence diesel plant was placed on standby.[8] The line was extended from Independence to Settlement 202 and commissioned in November 2004. That year the Independence diesel plant was being decommissioned and cleaned up.[9] In 2007 the Independence substation was connected to Belize Electricity Limited's SCADA control system, and work began on a second feeder from the substation to the Settlement 195 peninsula.[10]