The Thomas Vincent Ramos Highway, known as Route AR4 within the road numbering system, starts at mile 6 on the Road 8 and runs from Settlement 79 to Settlement 202 ending at the Bridge 115 as described in the Public Roads Act Ch. 232 Revised Edition 2011[1] and confirmed again in the S. I. No. 90 of 2023.[2][3]
The highway provides important access to a number of Mayan ruins and natural areas. The ancient Mayan sites of Nim Li Punit and Lubaantun are each situated a few miles west of the highway in southern Belize. The Cockscomb Basin Wildlife Sanctuary is several miles west of the highway in south-central Belize.[4]
History
The Toledo Road from Settlement 79 to the Settlement 89 was opened in March 1961.[5]
In the 1960s, the Forestry Department constructed the Southern Highway and handed it over to the Public Works Department as a dirt road in 1966. Measures were immediately taken to convert it to an all weather gravel road. An effort was also made to replace all the wooden bridges with permanent structures.[6]
Before the road was paved, flooding would often render the road impassable for 2-3 weeks at a time. The road had 53 single lane timber bridges and by 1988 seven of the major river crossings were being replaced with concrete and steel bridges.[7][8]
The detailed engineering designs were prepared by an international firm hired by the Government through international competitive bidding in October 1994. Financing for the engineering design was provided by ICDF, KFAED and the Government. The final report was presented in July 1995.
The project consisted of 4 phases. - 1: Punta Gorda to Rice Mill, 30.1 km - 2: Rice Mill to Bladen Bridge, 38.9 km - 3: Bladen Bridge to Big Creek Port, 41.5 km - 4: Mango Creek Junction to Stann Creek Valley Rd, 64.4 km
Construction of Section 1 started in February 1996 with Kuwait/OPEC funding, it advanced on schedule and was completed by November 23, 1998.[10] Because of low traffic count and sparse population the upgrading of Section 2 was not feasible in 1998. The Project for the ODA/UK financed Section 3 was scheduled for review late in 1997 and construction activities were supposed to begin early in 1998. Sections 4 and 5 (IDB and ICDF) were scheduled to commence late in 1998 and were completed by September 2002.
Under this project a further 176 km of feeder roads were rehabilitated and constructed.
Section 2 between Settlement 110 and Settlement 19 was finally completed in November 2010 after a $16 million contract with Cisco Construction was signed on December 4, 2007.[11]
Project Area: (Mile 6, Road 8 to Hopkins Junction)
This project commenced in September 2024 with a project completion date at the end of the first quarter 2025. The portion of the highway to be re-surfaced with hot mix asphalt concrete is from the intersection with Road 8 to the approach of Bridge 29 on the outskirts of Settlement 135.
On October 2, 2026, MIDH Chief Engineer Evondale Moody and Minister Julius Espat reported on a broader hot-mix resealing of the Thomas Vincent Ramos Highway. Moody said the ministry had placed about two inches of hot-mix asphalt over approximately 34 kilometres as a reseal of a formation considered still sound, after heavy truck traffic to southern ports and roadside development had increased wear on pavement last maintained since the highway was completed between about 2000 and 2007. Espat said that after a couple of months of use on the first phase, pothole failures had appeared, especially from Settlement 292 toward Settlement 79, where moisture under the overlay had risen through the asphalt. By October 2, 2026, about two and a half kilometres had already been rebuilt to a full new-road standard rather than simply re-overlaid, more than half of that problem stretch had been fixed, and the last phase of those warranty repairs was underway under the contractor's limited-liability period.[12]
In a News Five report broadcast on October 20, 2026, Moody stated that the works, under way since 2024, were not yet complete. Water had penetrated the disintegrating base of the existing formation, which dated from 2000 and had been kept because the project was designed only as a reseal, causing potholes and deflections after the hot mix was laid. As a result, sections totalling about 3.8 kilometres, not continuous, between the Mile Six junction and Settlement 292 had to be redone, and the contractor, still on site, carried out the remedial works.[13]
The road from Road 8 to Settlement 124 was known as the Forest Department Road A5 in 1963.[14] And then from Settlement 124 to the Settlement 89 it was known as Forest Department Road A6.
By 2013 the entire route was known as Arterial Route 5 (AR5).[15]
In 1961 the TV Ramos Highway was known as the Toledo Road. In the mid 1980s the highway was paved and I'm speculating that the highway was named the Southern Highway at this point.
But before being named the Southern Highway, the TV Ramos Highway was called various other names. From Settlement 79 to the Settlement 89 was called Stann Creek-Punta Gorda Road or the Big Falls-Belize Road (1976).[8] And the main road from Settlement 202 to Settlement 224 was called the Punta Gorda-San Antonio Road (1963[16],1976[8]).
On September 30, 2020 the Southern Highway was renamed to Thomas Vincent Ramos Highway. It was named after Thomas Vincent Ramos, the creator of Garifuna Settlement Day.[17]