Overview

Spanish Lookout is a private community and constructs and maintains it's own roads. At the Annual General Meeting that happens in January each year, community members are sometimes given a paper with 9 potential streets to upgrade and asked to number them by order. One or two of the top 3 voted on roads then get upgraded with chipseal during the year.

In January 2026 an additional paving scheme was initiated where residents along a road could entirely fund the paving of their street and then the community would refund the money over the next 10 years at a 4% interest rate.

Naming Convention

Main roads are spaced a mile apart more or less. The north-south streets are named alphabetically starting on the east and the east-west streets are numbered starting from the south. Smaller North-south streets are named starting with the letter of the main street to it's east and Smaller east-west streets are numbered with 3 digits according to it's geographic coordinate location based on the distance from the Belize River at Jireh School.

Streets and Lanes south of 60th Street are appended with East or West of Center Avenue.

Avenues west of Center Avenue are appended with North or South of 60th Street.

  • Avenue - A major road that goes south to north and meets these three criteria; Straight road, at least a half mile of developed road, and have houses on both sides of the road, ideally alos a through road.
  • Street - The same as an Avenue except it goes east to west.
  • Lane - A minor road that doesn't meet the criteria for Avenue or Street.
  • Drive - A road that has curves
  • Parkway - A road going past a park (optional)

Road Curves

If a road curves slightly but remains within 1/10th of a mile on it's original course then it keeps the same name. If a road curves and winds a lot then it's a drive.

Driveway Numbering System

Numbers are assigned to driveways instead of houses. Numbers are divided by 1000 in one mile, With 500 even numbers on one side of the road and 500 odd numbers on the other side. A road allowance is 66 ft, so the numbers have to be divided by 10.692 ft.

History

Spanish Lookout was founded in 1958 and almost immediately upon arriving they started hacking roads into the jungle. The first few years all men were required to serve a certain amount of time annually helping to build roads. After 1970 they started building roads into the Bajo (north of 50th Street) and debated on running the roads diagonally, which would be parallel with the borders, but residents voted against that.

The main mile grid streets were named by Otto K Reimer and ratified on July 26, 2003.[1] The north-south streets starting alphabetically from the east and the east-west streets were given route numbers starting from the south. In 2020 the streets were renamed and given the current naming convention which helped to name all the smaller roads in between the mile grids.


References
[1] SLC Monthly Meeting Minutes